Liberty Mutual

PEC continues to provide MEP+FP Engineering & Design Construction Documentation, and Construction Administration services for several office building tenant fit-out projects within the ever-expanding Liberty Mutual portfolio throughout the eastern United States totaling over 250,000 SF in thirty-one+ locations.

JPMorgan Chase & Co.

PEC provided MEP+FP Engineering & Design Due Diligence, Construction Documentation, and Construction Administration services for several office building tenant fit-out projects within the JPMC building portfolio.

White Clay Center – Buildings 100 / 600 / 700
White Clay Center – Building 200
Newark Corporate Center (NCC1) – Floors 02 & 03
Newark Corporate Center (NCC2) – Floor 01
Newark Corporate Center (NCC3) – Floors 01 & 02
Newark Corporate Center (NCC5) – Floors 01 & 02
Wilmington Corporate Center – 1CC Building – Floors 01, 08 & 12
Wilmington Corporate Center – 3CC Building – Floors 03, 07 & 08
Wilmington Corporate Center – 4CC Building – Third Floor
Baltimore, MD
Pittsburgh, PA
Washington DC – Bowen Building

BlackRock Capital Management

MEP+FP fit-out of 85,000 SF of 100 Bellevue Parkway in the Bellevue Corporate Center. Work on the facility began in 2000. Ten months later, BlackRock was moving into the completed building, which housed trading operations, a Data Center, fitness center, cafeteria, and administrative offices.

Provident Mutual Life Insurance

Shell and core and tenant fit-out design of a new 75,000 square-foot, three story, office building. PEC provided full-service MEP design services including HVAC (water cooled, field fabricated, chiller units and roof-top air handlers), plumbing, fire protection and electrical systems including, energy management and control systems, and telecommunications / data throughout.

Delaware Corporate Center

New general-purpose office building (50,000 sq. ft.) in Wilmington, Delaware. PEC designed HVAC, plumbing and electrical systems, including VAV system, and distributive, digital energy management and control systems.

UniQema

Shell and core and tenant fit-out design. 60,000 square feet. PEC is providing full-service MEP design services systems consisting of HVAC, plumbing, fire protection and electrical systems including water source heat pump system, energy management and control systems, and telecommunications / data wiring throughout.

Dupont Company
Barley Mill Plaza


New telemarketing office building (60,000 sq. ft.) in Wilmington, Delaware. PEC designed HVAC, plumbing and electrical systems, including VAV system and distributive, digital energy management and control systems, and data systems.

Three Mill Road
Spec Office Building

New office building for commercial leasing (45,000 sq. ft.) for Rokeby Realty in Wilmington, Delaware. PEC designed HVAC, plumbing and electrical systems, including water source heat pump system, fire protection, and distributive, digital energy management and control systems. The project also included a 2-story open parking garage below the building.

Nemours Building

Complete renovation of four floors (125,000 sq. ft.) for new office and computer facilities. PEC designed HVAC, plumbing and electrical systems, including VAV system, and distributive, digital energy management and control systems.

Dupont Building

Complete renovation of legal offices on the 7th floor of the Dupont Building. PEC designed HVAC, plumbing and electrical systems, including conference centers’ special systems.