DuPont-Merck Company
New 60,000 square feet Laboratory/Testing Facility (Building# 336) at the Experimental Station in Wilmington, Delaware.
Southco, Inc.
Phase III Brandywine II
New 30,000 square feet Office and Laboratory Facility for the Engineering Research Group.
Southco, Inc.
Test Lab
New 15,000 square feet Laboratory Building including a Robotics Lab, Wet Lab and several General Testing Labs.
UniQema
New 15,000 square feet Laboratory Facility for the Engineering Research Group.
DuPont Company
Chestnut Run Site
Mechanical and electrical design for a burn-testing chamber in Wilmington, Delaware. This facility tested the degree of burn inflicted on a human mannequin with over 200 thermocouples and clothed with different fabrics. The facility required innovative design in the areas of flame control, smoke removal, liquid propane storage and gas generation and safety.
Polysciences Inc.
MEP services for a new research laboratory consisting of lab work benched and six fume hoods complete with specialty utilities.
DuPont Company
Chestnut Run Site
Building 709
Mechanical and electrical design for two paint spray booths in Wilmington, Delaware. Space conditions of 70° F temperature and 60 % relative humidity were part of the design criteria.
DuPont Company
Marshall Lab Site
PEC provided the complete MEP+FP Engineering & Design for several research laboratory projects for DuPont Co – Marshall Lab site in Philadelphia, PA:
- Spray Booth Laboratories – Buildings 157, 247 & 257
- Accelerator Weather Laboratory
- Formulations Laboratory
DuPont Company
Chestnut Run Site
PEC provided the complete MEP+FP Engineering & Design for several research laboratory projects for DuPont Co – Chestnut Run site in Wilmington, DE:
- Environmental Laboratory – Building 712
- Technical Marketing Laboratory – Building 709
- Formulations Laboratory